Welcome to the Cave Diver's Forum.
+ Reply to Thread
Results 1 to 2 of 2

Thread: Peacock 4-10-10

  1. #1
    Member
    Join Date
    Oct 2006
    Location
    Neptune Beach, FL
    Posts
    3,300

    Default Peacock 4-10-10

    Dove Peacock 1

    Went up Peanut Line to Chslledge Line
    Swam half way to Challedge
    Backtracked to the Crossover Tunnel
    Exited by the Main Line

    Visibility was 40' except for a few patchy areas
    Visibility from Peanut Restriction to Challedge was a slight tannic with 20-30'

    Water temp
    Main Line 68
    Peanut 72

    116 minute dive
    CCR
    no deco
    set point 1.2

    Safe Diving


  2. #2
    Administrator Forum Admin
    Join Date
    Oct 2000
    Location
    Georgia
    Posts
    24,000

    Default

    We did OG to Challenge Friday, and it was around 60' viz, with noticeable current.

    Forrest Wilson (with 2 Rs)
    Any opinions are personal.
    Sump Divers


 

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts