Dove Peacock 1

Went up Peanut Line to Chslledge Line
Swam half way to Challedge
Backtracked to the Crossover Tunnel
Exited by the Main Line

Visibility was 40' except for a few patchy areas
Visibility from Peanut Restriction to Challedge was a slight tannic with 20-30'

Water temp
Main Line 68
Peanut 72

116 minute dive
CCR
no deco
set point 1.2

Safe Diving